Product Details
Place of Origin: Guangzhou, Guangdong, China
Brand Name: HONGSHUYE
Certification: ISO9001,MSDS,CE
Model Number: Polyurethane foam sealant
Payment & Shipping Terms
Minimum Order Quantity: 300pcs
Price: Negotiation
Packaging Details: 750ML
Delivery Time: Within 10 days after deposit
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 1000000 Pieces per Month
Product Type: |
Sealant |
Port: |
Shanghai |
Box: |
1x15 |
Heat Resistance: |
Yes |
Chemical Resistance: |
Resistant To Most Chemicals |
Fire Resistance: |
Fire-resistant |
Soundproofing: |
Provides Soundproofing Properties |
Type: |
Single-component, Moisture-cured Polyurethane Foam |
Temperature Resistance: |
Can Withstand Temperatures From -40°F To 194°F |
Application Temperature: |
5°C To 35°C |
Packing: |
15PCS/CTN |
Elongation At Break: |
100-200% |
Material: |
Polyurethane |
Product Type: |
Sealant |
Port: |
Shanghai |
Box: |
1x15 |
Heat Resistance: |
Yes |
Chemical Resistance: |
Resistant To Most Chemicals |
Fire Resistance: |
Fire-resistant |
Soundproofing: |
Provides Soundproofing Properties |
Type: |
Single-component, Moisture-cured Polyurethane Foam |
Temperature Resistance: |
Can Withstand Temperatures From -40°F To 194°F |
Application Temperature: |
5°C To 35°C |
Packing: |
15PCS/CTN |
Elongation At Break: |
100-200% |
Material: |
Polyurethane |
Polyurethane Foam Sealant Buildings Houses Environmentally Friendly Foam Sealant
Factory Information:
With 20 years of glue-making experience, the factory covers an area of 40,000 square meters, is equipped with highly
mechanized equipment, has a daily output of 30,000 pieces, and more than 200 production and R&D personnel. The source
factory supports OEM/ODM. The products have high cost performance. We look forward to your contact.
HONGSHUYE SPRAY INSULATION FOAM is a kind of high thermosetting polyurethane foom. It can form a continuous
thermal insulation layer. It is widely used for roof and wall thermal insulation.
TYPICAL USES :
1. Ideal for ceiling insulation
APPLICATION INSTRUCTIONS
1, Remove the dust, greasy dirt on the surface before construction.
2, Spray a little water on construction surface when the humidity is below 50 degrees, otherwise the heartburn or punch
phenomenon will appear .
3, The flow rate of the foam can be adjusted by the control panel.
4, Shake the container for 1 minute before using, connect material container with spray gun or spray pipe, the filler content is
1/2 of the gap.
5, Use dedicated cleaning agent to clean the gun Surface drying time is about 5 minutes, and it can be cut after 30 minutes,
after 1 hour the foam will be cured and achieve stable in 3-5 hours.
6, This product is not UV-proof, so it is suggested to be cut and coated after the foam curing (such as cement mortar,
coatings,etc.)
7, Construction when temperature is lower than -10 ℃, to ensure the material can be exhausted and increase the foam
expansion, it should be heated by 40 ℃ to 50 ℃ warm water
Factory Pictures
Contact
+86 13302391599 | |
Telephone | +86 13302391599 |
mangrove88@126.com |
FAQ
Q1. When can I receive my products?
A1: Sample order need 1 - 3 days.
Mass production need 7- 10 workdays.
|
Q2. Can you send me samples for reference?
A2: Yes, we are glad to send you free samples.
|
Q3. Can you provide OEM service?
A3: Yes, and we can custom the volume and tube package.
Q4: Where is your factory? Can I visit it?
A4:Our factory locate in Guangdong Province, welcome to visit us anytime!
|
Q5: What is the payment term that you can provide?
A5: Sample 100% payment.
30% TT prepayment and 70% balance payment for mass order.
|